Construction of Interstate 95 into downtown Boston, MA was canceled in 1972 after local protest over the necessary demolition. However, land for the Southwest Corridor through Roxbury had already been cleared of buildings. Instead of a highway, the Orange Line subway would be re-routed into the corridor. In 1987, the Washington Street Elevated was torn down as part of this re-routing, the last of the original elevated portions to be demolished.
Comments